Network Maintenance: reload network switch u-hsbrf-2-1-c9300-stk on Thursday, Sept 17,2026 between 3 AM and 5:30 AM
Scheduled for Sep 17, 03:00 - 05:30 PDT
Scheduled
Datacom/Netmon has scheduled the following network maintenance:
What: reload network switch u-hsbrf-2-1-c9300-stk When: Thursday, Sept 17, 2026, between 3 AM and 5:30 AM Scope: reload the switch to upgrade the IOS software code to resolve a software bug issue. Impact: loss of wired and wireless network connectivity to network switch u-hsbrf-2-1-c9300-stk for approx 30 minutes. The switch is located at Health Sciences Biomedical Research Facility Telecommunications Room 2.1 (HSBRF 2.1 TR)